Pembroke Finished Basement
-
Finished Basement Pembroke 5
http://www.johnsonconstruction.net/wp-content/uploads/2010/12/Finished-Basement-Pembroke-5.jpg
IN THIS CASE THE BASEMENT HAD MANY COLLUMNS SO THE HALF WALL WITH WRAPPED POSTS WORKS WELL.
-
Finished Basement Pembroke 4
http://www.johnsonconstruction.net/wp-content/uploads/2010/12/Finished-Basement-Pembroke-4.jpg
PERGO FLOORS GIVE A NICE LOOK WITHOUT LOSING VALUABLE CEILING HEIGHT.
-
Finished Basement Pembroke 3
http://www.johnsonconstruction.net/wp-content/uploads/2010/12/Finished-Basement-Pembroke-3.jpg
A NICE LOOK AT THE OPEN RAIL AND STAIRWAY.
-
Finished Basement Pembroke 2
http://www.johnsonconstruction.net/wp-content/uploads/2010/12/Finished-Basement-Pembroke-2.jpg
THE OPEN RAIL STAIRWAY WITH OAK TREADS GIVE THIS BASEMENT A RICH LOOK.
-
Finished Basement Pembroke 1
http://www.johnsonconstruction.net/wp-content/uploads/2010/12/Finished-Basement-Pembroke-1.jpg
HALF WALLS GIVE A WIDE OPEN FEEL TO THIS FINISHED BASEMENT.
Finished basement in Pembroke, MA by Johnson Construction Company. See photos below.